Public Information Center
The New Jersey Department of Transportation (NJDOT) is committed to developing transportation improvements that balance transportation needs, safety, the environment, community concerns, and cost. NJDOT will be holding a Virtual Public Information Center (PIC) to provide local residents, public officials, and businesses with information on the Route 54 Bridge Over Penny Pot Stream project. You are encouraged to actively participate by providing comments by mail, by emailing Route54overPennyPot@gmail.com, or the comment form on this website.
The PIC will be held virtually. Please visit this website between June 29, 2026 and July 13, 2026 to learn more about the project and provide comments.
PIC meeting documents can be downloaded or viewed with the links below.
Virtual PIC Flyer
Virtual PIC Presentation Slides
Project Details
The project consists of a Concept Development Study intended to improve the Route 54 Bridge over Penny Pot Stream and extend its functional service life. Existing conditions include poor deck conditions and poor superstructure conditions. While the bridge continues to carry critical regional traffic and utilities, its current condition presents ongoing maintenance challenges and rideability concerns.
Project goals include implementing a cost-effective solution, improving safety, extending the service life of the structure and minimizing traffic disruptions during construction. To address these conditions, the Preferred Preliminary Alternative (PPA) is proposed as follows:
Precast Reinforced Three-Sided Ridge Frame
Full replacement of the bridge
One 12-foot travel lane in each direction
Two 11-foot-wide shoulders
Two 10-foot 5/8-inch-wide shared use paths
Shared Use Paths will be separated from the roadway with a 3-foot 6-inch-high barrier
A 3-foot 6-inch-high steel bridge pedestrian railing on either side of the bridge
The PPA addresses existing conditions by extending service life while maintaining traffic operations and minimizing construction impacts.
Concept Development: Anticipated Completion Early 2027
Preliminary Engineering: Anticipated Completion 2029
Final Design: Anticipated Completion 2031
Construction Start: Anticipated 2031
Contact Us
For further information, please contact:
Sandra Opoku
New Jersey Department of Transportation
Office of Government and Community Relations
1035 Parkway Avenue | PO Box 600 | Trenton, NJ 08625
Phone: (609) 963-2684
E-mail: SandraO.Opoku@dot.nj.gov
You may also submit a question or comment using the form below.